Close Menu
To CivilTo Civil

    Subscribe to Updates

    Get the latest creative news from ToCivil about Civil Engineering, Construction and Estimation.

    What's Hot

    Difference Between QA/QC and Quantity Surveying

    November 13, 2024

    Basic knowledge for Civil Engineering Students

    August 31, 2023

    State and Explain Prestressed Concrete, Types, Advantages

    August 27, 2023
    Facebook X (Twitter) Instagram
    Trending
    • Difference Between QA/QC and Quantity Surveying
    • Basic knowledge for Civil Engineering Students
    • State and Explain Prestressed Concrete, Types, Advantages
    • What is Bar Bending Schedule and its Formulas
    • Bearing Capacity of Soil (Types & Methods of Calculation)
    • Types of Wood Joints and their uses (pdf)
    • Manhole (Types, Purpose, Construction, Applications)
    • State & Explain Arch Bridge and its Types
    To CivilTo Civil
    • Home
    • Surveying
    • Estimations
    • Bar Bending Schedule
    • Civil Engineering
    • Buildings Construction
      • Building Structure
      • Materials
    • Engineering Mechanics
      • Bridge Engineering
      • Soil Mechanics
    To CivilTo Civil
    Home » Surveying
    Surveying

    Traversing with Theodolite Step-by-Step Guide

    State and Explain Traversing in Surveying
    Azib RajputBy Azib RajputMarch 24, 2023No Comments10 Mins Read
    Facebook Twitter Pinterest LinkedIn Email Telegram WhatsApp
    traversing in surveying pdf, types of traverse in surveying, traverse surveying procedure, open traverse, open and closed traverse in surveying pdf, open traverse in surveying, what is traversing, traverse surveying problems and solutions,
    Explain Traversing in Surveying
    Share
    Facebook Twitter LinkedIn Pinterest Email WhatsApp

    What is Traversing in Surveying

    The Traversing can be described in the following points;

    Table of Contents

    Toggle
    • What is Traversing in Surveying
      • What is Surveying
      • Definition of Traversing
      • Types of Traverse
        • Open Traverse
        • Closed Traverse
      • Methods of Traversing
      • Theodolite Traversing
        • The direction of Traverse lines
      • Direct Observation of Angles
        • Traversing by the method of included angles
        • Locating Details
        • Traversing by the method of direct angles
        • Traversing by the method of deflection angles
      • FAQ’s
        • What are the 3 main parts of theodolite?
        • Which instrument is used in traversing?
        • Which method of traversing is more accurate?
        • What is the advantage of traversing by theodolite?
        • What is traditional traverse method?
    • The definition of traverse is “passing across.” It refers to “determining the lengths and directions of consecutive lines” in surveying.
    • The relative directions of the lines are measured with a compass, theodolite, or chain, and linear measurements are taken with tape or chain.
    • The essential two-dimensional data for calculating the land area and delivering horizontal control comes from direction and distance measurement.
    • Combined with results from a level network at the exact location, this data can depict a slice of Earth’s surface in three dimensions.
    • Reconnaissance (choosing, marking, and referencing stations), details, and booking field notes are part of the traversal process.
    • A general traverse is run to locate the features already existing in the area to be surveyed or to establish points or lines by predetermined measurements.

    What is Surveying

    Surveying is the process of figuring out where different things on, above, or below the earth’s surface are with each other by taking direct or indirect measurements and then drawing them on a piece of paper called a plan or map.

    Surveying is the science and art of taking all the necessary measurements to find out where points or physical and cultural details are with each other above, on, or below the surface of the Earth and drawing them in a way that can be used, or to find out where points or details are.


    Definition of Traversing

    A traverse is a set of connected lines whose lengths and directions must be measured. Traversing is the surveying process used to find these lengths and directions. In general, chains are used to measure length, and a compass or theodolite is used to measure the direction of traverse lines.

    Traversing

    This article discusses the different kinds of traverse and how to do it with Theodolite


    Types of Traverse

    There are two main types of traverse

    • Open Traverse
    • Closed Traverse

    Open Traverse

    traversing in surveying pdf,
types of traverse in surveying,
traverse surveying procedure,
open traverse,
open and closed traverse in surveying pdf,
open traverse in surveying,
what is traversing,
traverse surveying problems and solutions,
    Fig 1.1 (Open Traverse)

    When a traverse starts at one point and ends at another, as shown in the figure, it is called an open traverse. You can also call open traverse “unclosed traverse.” It can be used to measure roads, coastal lines, etc.

    Closed Traverse

    traversing in surveying pdf,
types of traverse in surveying,
traverse surveying procedure,
open traverse,
open and closed traverse in surveying pdf,
open traverse in surveying,
what is traversing,
traverse surveying problems and solutions,
    Fig 1.2 (Closed Traverse)

    As shown in the figure, a traverse is said to be closed when it forms a closed circuit. In this case, the traverse’s starting and ending points are identical. It is appropriate for surveying the boundaries of ponds, sports fields, forests, etc.


    Methods of Traversing

    The traversing is done in four different ways, classified based on the survey instrument used. The methods are as follows.

    • Chain Traversing
    • Compass Traversing
    • Theodolite Traversing
    • Plane Table Traversing

    In this Article, We discuss Traversing with a Theodolite with Differents methods


    Theodolite Traversing

    In the case of theodolite traversing, the chain or stadia method is used to measure length, and the theodolite is used to measure angles. The magnetic bearing of the first traverse line is measured using a theodolite, and the magnetic bearings of the other sides are calculated based on that magnetic bearing. Compared to other ways, this one works very well.

    In Theodolite traversing the fieldwork consisting of the following steps

    • Reconnaissance
    • Selection, marking, and referencing of station
    • Running of survey lines
    • Picking up the details
    • Booking of field notes is much the same as for compass
    • For linear measurements, then steel tape is generally used

    The direction of Traverse lines

    The methods by which the relative directions of the lines of a traverse may be determined are

    • By the measurement of angles between successive lines.
    • By the direct observation of the bearings of the line

    The former is generally used for long traverses, or for which high precision is required, while the latter is used for short traverses where great precision is not required like topographical surveys

    In the first method, the angles between successive lines were measured, and the bearing of the initial line was observed. The bearings of the remaining lines are then calculated from the observed bearing and the measured angle.

    Measuring Angles

    The angles measured at the different stations may be.

    • Included Angles
    • Direct Angles or angles to the right
    • Deflection Angle

    Direct Observation of Angles

    There are three methods for direct observation of angles are given below;

    • Traversing by the method of included angles
    • Traversing by the method of Direct angles
    • Traversing by the method of Deflection angles

    Traversing by the method of included angles

    This method is mainly used in land surveying where great accuracy is required; it is invariably used as the angles can be measured by the method of repetition in any degree of precision. In this method bearing of the initial line and the included angles of a traverse are measured.

    In closed traverse, the angle measured is either interior or exterior according to the traverse being run in a counter-clockwise or clockwise direction, as shown in fig; below. It is, however, customary to run a closed traverse in a counter-clockwise direction

    Procedure of Traverseing

    • In running the traverse ABCDEFGH, the theodolite is set up over the first station A, and the bearing of line AB is observed, as already explained.
    • The angle HAB is then measured by taking a backsight on the preceding station H and foresight on the forward station B.
    • Turning the telescope clockwise, both verniers are then read.
    • This means that the two vernier readings give the required angle HAB.
    • Face-left and face-correct observations should be made to eliminate instrumental errors.
    • The theodolite is then moved to each of the successive stations’ BC etc., and the angle ABC, BCD, etc., are measured similarly.
    • The line AB, BC, etc., are measured with the tape or chain, and the offsets necessary to locate the boundary and other details are taken in the usual way and recorded in the field book.
    • Where great accuracy is required, the angles should be measured by repetition, as already described. The angular observation is recorded in tabular form as given below:

    Locating Details

    On nearly all theodolite surveys, especially in city surveys, the details, such as the frontage of buildings, distant and inaccessible objects, etc., are located from transverse lines with the transit and tape. The following angular methods are in most common use.

    i. Locating by angle and distance from transit station

    In this method, the transit is set up at station A, and the angle between the transverse line AB and the corners of the building, such as AB, etc., are measured, and the corresponding distance AB, etc. Curves of large radii or irregular curves are located by angles and distances. For each angle, 2 points are located by measuring the distances from transit station A.

    
traversing in surveying pdf,
types of traverse in surveying,
traverse surveying procedure,
open traverse,
open and closed traverse in surveying pdf,
open traverse in surveying,
what is traversing,
traverse surveying problems and solutions,
    Fig 1.3 (Locating by angle and distance from transit station)

    ii. Locating by angle and distance from another station

    This method is proper when the direct measurement of the distance from the transit station at which the angle in the object is measured is not possible, growing to some intervening obstacle. In such a case that transit is set up at another station b, the angle between the transverse line ab and the corner f of the building is observed, and the distance bf is measured.

    
traversing in surveying pdf,
types of traverse in surveying,
traverse surveying procedure,
open traverse,
open and closed traverse in surveying pdf,
open traverse in surveying,
what is traversing,
traverse surveying problems and solutions,
    Fig 1.4 (Locating by angle and distance from another station)

    iii. Locating by angles from two stations

    Illustrate the method of locating distant or inaccessible objects visible from at least the transit station. The transit is set up at the transit station a, and the angle to the object, such as t, is measured. Similarly, the angle to t is measured on another transit station b. In this method, no linear measurements except those of the transverse lines are required.


    Traversing by the method of direct angles

    This method is mainly used on open traverses. To run and open travels, theodolite is set up at the starting station a, and the bearing of line ab is observed. The theodolite is then moved to be with the vernier a set to zero, a backsight is taken on the presiding station a. Unclamping the upper plate and turning the telescope clockwise, a foresight is taken on the following station c, and both verniers are read. The mean of the vernier readings gives the required angle ABC. The other angles are read in a like manner. The traverse angles are checked by doubling. The lines AB and BC etc., are changed, and the necessary offsets are taken the usual way.

    Traversing by the method of deflection angles

    This method is chiefly employed on open traverses. It is most suitable when the survey lines make small deflection angles with each other, as in the case of surveys for roads, railways, canals, and pipelines. Suppose it is required to run a traverse from station A. Theodolite is set up at station a, and the bearing of line ab is observed.

    The instrument is then moved to station be, and a backsight is taken on with the vernier set to zero. The telescope is transitive, and foresight is taken on c by releasing the upper played and turning the telescope clockwise. Both verniers are then read, and the mean of these readings gives the deflection angle of BC from AB. The direction of its measurement is carefully noted in the field book. The theodolite is then set up at each successive station C D E etc., and the deflection angles are observed as described and recorded in the field book.

    The routine of running survey lines and setting is the same as already explained. It must be remembered that in this method that, deflection angles are measured to the right or the left of the back line produced, and the direction of their measurement must be very carefully noted in the field book to eliminate the error of adjustment and possible mistakes.


    More Articles

    WHAT IS A ROOF OVERHANG | TYPES & BENEFITS
    WHAT IS BAR BENDING SCHEDULE AND ITS FORMULAS
    TYPES OF WOOD JOINTS AND THEIR USES (PDF)
    ESTIMATION OF SINGLE-STOREY BUILDING STEP-BY-STEP GUIDE
    Estimation of a Sewer Line and Septic Tank

    FAQ’s

    What are the 3 main parts of theodolite?

    It is essential to know what each part of a theodolite does. The parts should know how to work together. Without regulation, the parts can’t be put together right. Theodolite is made up of a few main parts, like Telescope. Vertical circle. Index frame. It’s a main part of the theodolite.

    Which instrument is used in traversing?

    In general, chains are used to measure the length of traverse lines, while a compass or theodolite is used to measure the direction. Nowadays Total station technique (Electrical Surveying Machine) is used to measure the direction, length, and angle. It is more accurate than Compass or theodolite.

    Which method of traversing is more accurate?

    Coordinate method: In this method, the coordinates of the survey stations are used to plot their locations. It is the easiest and most accurate way to plot traverses or any other sizeable horizontal control system. Total station and theodolite are used for this method. A total station is more accurate.

    What is the advantage of traversing by theodolite?

    Compared to other layout tools, theodolites with optical instruments are better. They can measure more accurately; a digital electronic theodolite automatically reads horizontal and vertical angles. It removes the need to read scales on graduated circles by hand, which removes the chance of making a mistake.

    What is traditional traverse method?

    Using a transit or theodolite, the internal, external, and deflection angles were turned for the traverse method. At each point along the boundary, measure the distances between each point with a chain or electronic distance meter (EDM). At the very least, this method took much time and was hard to do.


    open and closed traverse in surveying pdf open traverse open traverse in surveying traverse surveying problems and solutions traverse surveying procedure traversing in surveying pdf types of traverse in surveying what is traversing
    Share. Facebook Pinterest LinkedIn WhatsApp
    Previous ArticleWhat is a Roof Overhang | Types & Benefits
    Next Article What is Plane Table Surveying | Advantages & Disadvantages
    Azib Rajput
    • Website
    • Facebook
    • X (Twitter)

    Hi! Welcome to my blog. My name is Azib Rajput, and I am the creator of ToCivilEngineerings.com. This website was created for educational purposes to assist fellow civil engineering students and to share information about the most recent civil engineering projects and software. I am a Civil Engineer by profession, but I’ve specialized and taken the journey in the field of Quality Engineering. For nearly five years, I worked as a Quality Engineer and Manager for well-known companies in the Gulf region.

    Related Posts

    Cases of Resection | Errors in Plane Table Survey

    March 29, 2023

    State and Explain Methods of Plane Table Surveying

    March 27, 2023

    What is Plane Table Surveying | Advantages & Disadvantages

    March 26, 2023
    Add A Comment
    Leave A Reply Cancel Reply

    Top Posts
    Civil Engineering

    Types of Wood Joints and their uses (pdf)

    By Azib RajputMay 5, 2023

    Wood joints are made from pieces of wood using glue, pegs, fasteners, or nails as the joining agent.

    Soil Mechanics

    Bearing Capacity of Soil (Types & Methods of Calculation)

    By Azib RajputMay 8, 2023

    The bearing capacity of soil refers to the maximum load that can be applied to the soil without causing a shear failure or excessive foundation settlement.

    Surveying

    State and Explain Methods of Plane Table Surveying

    By Azib RajputMarch 27, 2023

    In this method of plane table surveying, the point is located on the plan by drawing a ray from the plane table station to the fact and plotting to scale along the beam the distance measured from the station to the end. The method is suitable for surveying small areas which can be commanded from a single station. It is chiefly used for locating the details from stations, which other forms of surveying, such as triangulation or transit-tape traversing, have previously established.

    Recent Posts
    • Difference Between QA/QC and Quantity Surveying
    • Basic knowledge for Civil Engineering Students
    • State and Explain Prestressed Concrete, Types, Advantages

    Subscribe to Updates

    Get the latest creative news from ToCivil about Civil Engineering, Construction and Estimation.

    We Provide the Latest knowledge and information about Civil Engineering, Construction, Infrastructure, Building Construction, Designing and Development.

    We're social. Connect with us:

    Facebook X (Twitter) Instagram Pinterest YouTube
    LATEST POSTS

    Difference Between QA/QC and Quantity Surveying

    November 13, 2024

    Basic knowledge for Civil Engineering Students

    August 31, 2023

    State and Explain Prestressed Concrete, Types, Advantages

    August 27, 2023
    Categories
    Bar Bending Schedule Bridge Engineering Buildings Construction Building Structure Civil Engineering Engineering Mechanics Materials Quantity Surveying Soil Mechanics Surveying
    Facebook X (Twitter) Instagram Pinterest LinkedIn WhatsApp Reddit RSS Twitch Flickr
    • Contact Us
    • About Us
    • Privacy Policy
    • Disclaimer
    • Terms and Conditions
    © 2025 To Civil Engineering Blog. All Rights Reserved.

    Type above and press Enter to search. Press Esc to cancel.