Close Menu
To CivilTo Civil

    Subscribe to Updates

    Get the latest creative news from ToCivil about Civil Engineering, Construction and Estimation.

    What's Hot

    Difference Between QA/QC and Quantity Surveying

    November 13, 2024

    Basic knowledge for Civil Engineering Students

    August 31, 2023

    State and Explain Prestressed Concrete, Types, Advantages

    August 27, 2023
    Facebook X (Twitter) Instagram
    Trending
    • Difference Between QA/QC and Quantity Surveying
    • Basic knowledge for Civil Engineering Students
    • State and Explain Prestressed Concrete, Types, Advantages
    • What is Bar Bending Schedule and its Formulas
    • Bearing Capacity of Soil (Types & Methods of Calculation)
    • Types of Wood Joints and their uses (pdf)
    • Manhole (Types, Purpose, Construction, Applications)
    • State & Explain Arch Bridge and its Types
    To CivilTo Civil
    • Home
    • Surveying
    • Estimations
    • Bar Bending Schedule
    • Civil Engineering
    • Buildings Construction
      • Building Structure
      • Materials
    • Engineering Mechanics
      • Bridge Engineering
      • Soil Mechanics
    To CivilTo Civil
    Home

    Contact Us

    Our office is located within the company’s building.

    Address: Street No 35A, Sector I 9/4, Islamabad
    Phone: +92 3035854203


    Please enable JavaScript in your browser to complete this form.
    Name *
    Loading
    Top Posts
    Quantity Surveying

    How to Calculate Earthwork in Plane Area

    By Azib RajputApril 6, 2023

    This is more in the construction of buildings than in constructing roads, railway lines, and dams. Many earthworks are involved in making embankments along canals and the river. During earthwork, the soil is lifted from one place and thrown away in the other place.

    Quantity Surveying

    Difference Between QA/QC and Quantity Surveying

    By Azib RajputNovember 13, 2024

    Introduction to QA/QC and Quantity Surveying QA/QC and Quantity Surveying are the terms which can…

    Quantity Surveying

    Estimation of a Sewer Line and Septic Tank

    By Azib RajputApril 13, 2023

    In rural areas, septic tanks are constructed in factories without sewage treatment. They are built separately for each house, for a few houses or a small colony.

    Recent Posts
    • Difference Between QA/QC and Quantity Surveying
    • Basic knowledge for Civil Engineering Students
    • State and Explain Prestressed Concrete, Types, Advantages

    Subscribe to Updates

    Get the latest creative news from ToCivil about Civil Engineering, Construction and Estimation.

    We Provide the Latest knowledge and information about Civil Engineering, Construction, Infrastructure, Building Construction, Designing and Development.

    We're social. Connect with us:

    Facebook X (Twitter) Instagram Pinterest YouTube
    LATEST POSTS

    Difference Between QA/QC and Quantity Surveying

    November 13, 2024

    Basic knowledge for Civil Engineering Students

    August 31, 2023

    State and Explain Prestressed Concrete, Types, Advantages

    August 27, 2023
    Categories
    Bar Bending Schedule Bridge Engineering Buildings Construction Building Structure Civil Engineering Engineering Mechanics Materials Quantity Surveying Soil Mechanics Surveying
    Facebook X (Twitter) Instagram Pinterest LinkedIn WhatsApp Reddit RSS Twitch Flickr
    • Contact Us
    • About Us
    • Privacy Policy
    • Disclaimer
    • Terms and Conditions
    © 2025 To Civil Engineering Blog. All Rights Reserved.

    Type above and press Enter to search. Press Esc to cancel.